Sample opportunity brief Real product data · through 2026-10-06

Below is a complete GOMDecom Opportunity Brief for White Fleet Operating ST 26, built from current BSEE data. It shows why the campaign is commercially relevant now, what observable scope appears to remain, upcoming activity, and the source evidence behind each signal.

See the commercial case, remaining scope, next pursuit signals, and source evidence behind this live opportunity.

This is the same level of detail included in paid Opportunity Briefs. Verify all values against the cited BSEE sources before acting.

Get this for your target operator — $19 →

White Fleet Operating — ST 26 (+1 operator)

ST 26 · Underway · 61 ft water depth

Engage now
100/100 commercial score High confidence $9.2M P50 exposure

Engage now: 1 PA permit filed with work not commenced — decom deadline passed 570 days ago.

Why now

Why now

  • 1 PA permit filed with work not commenced — BSEE filings show no work start on this scope
  • 1 open structure-removal application in monitored records — verify package, award and execution status
  • BSEE activity report lists unit NON RIG UNIT OPERATION on this lease (report start 2026-08-23) — evidence of reported field activity, not current presence or contract status
  • next known milestone 2026-12-31 (Permanent abandonment permit work scheduled to commence)
  • remaining observable scope: 1 well P&A open, 21 TA-permitted wells (future PA), 1 removal app open, 7 structures standing, 2 pipeline segs
  • Lease Relinquished — lease ended 2024-03-15; standard 1-year decom deadline 2025-03-15 passed 570 days ago (case-specific schedules may apply)
Remaining observable scope 7 items

Remaining observable scope

Wells awaiting P&A20
P&A permits open1
TA wells on record21
Standing structures7
Pipeline segments in decom2
Wells with EOR confirmations54
Pipeline miles on lease12
Likely relevant services 8 services

Likely relevant services

Well P&ACementing & pluggingWireline / interventionMarine supportStructure removalHeavy liftSite clearancePipeline decommissioning

Regulatory clock 570 days overdue

Regulatory clock

570 days past the standard decom deadline

  • Lease Relinquished — lease ended 2024-03-15; standard 1-year decom deadline 2025-03-15 passed 570 days ago (case-specific schedules may apply)
  • No production since 2021-08 — Idle Iron criteria (unused 5+ years) likely met
  • TA wells idle since 1983 — Idle Iron guidance expects idle wells addressed within 3 years of becoming no longer useful
What to watch next Priority

What to watch next

  • Rig or contractor identified on permit
  • Work commencement
  • New PA permit filings
  • Removal approval or execution
  • Pipeline decommissioning applications
  • End-of-operations reports (scope completing)
  • Next known date: 2026-12-31 — Permanent abandonment permit work scheduled to commence
Commercial score factors 100/100

Commercial score factors

  • Remaining scope: 20 open wells, 7 open structures (30/30)
  • Sales window: 1 PA permit filed, work not commenced (10 pts)
  • Future milestone 2026-12-31: Permanent abandonment permit work scheduled to commence (10 pts)
See 9 more scoring factorsHide extra scoring factors
  • Fresh signal in last 90 days (2026-09-30, 5 pts)
  • Lease status Relinquished — decommissioning clock running (10 pts)
  • Standard decom deadline 2025-03-15 passed 570 days ago (5 pts)
  • Production ceased — last producing month 2021-08 (5 pts)
  • TA wells idle 5+ years (oldest 1983, 5 pts)
  • Campaign already executing — remaining scope moves soon (5 pts)
  • Operator momentum: Apache runs active execution campaigns (5 pts)
  • Active campaign in the same area (ST) — add-on to a mobilized spread (5 pts)
  • Stage certainty: EXECUTION (10/10)
Confidence evidence High

Confidence evidence

  • 75 BSEE permit/application records back this opportunity (25 pts)
  • 156 evidence signals (20 pts)
  • 54 wells carry end-of-operations confirmations (15 pts)
See 3 more confidence factorsHide extra confidence factors
  • BSEE cost estimates cover 26 facilities (20 pts)
  • Lease status and production history on record (10 pts)
  • Corroborated across well and structure datasets (10 pts)
BSEE cost context $9.2M P50

BSEE cost context

Remaining decommissioning exposure on this opportunity is $9.2M at BSEE P50 ($18.3M P90). This is a regulatory exposure estimate—not a tender value or contractor revenue estimate.

Source evidence 7 datasets

Source evidence

Built from these official BSEE datasets. Cross-check any figure directly at data.bsee.gov ↗.

eWell abandonment permits (APM)

P&A and TA permits behind the well scope, including filed permits with work not yet commenced

Borehole status

Current abandonment status of every well on the lease

Platform structures & removals

Standing structures and removal applications

Pipeline permits

Pipeline segments in decommissioning on the lease

Lease assignments & ownership

Operator history and lease status

Lease production

Last producing month on record

Decommissioning cost estimates

BSEE P50/P70/P90 exposure for wells, platforms, and pipelines

New to reading BSEE filings? The decommissioning signal chain explains how these datasets show the work before a contract exists.

Last signal 2026-09-30 Lease G01870 · status Relinquished

Pursuing a specific Gulf opportunity?

Get the same commercial brief for an operator, lease or block you're interested in—remaining observable scope, commercial timing, upcoming activity and the complete BSEE evidence trail.

How the score and confidence are computed →